Well Point Installation Project - INVITATION TO BID
Invitation to Bid - Notice to Prospective Bidders
Notice Date: July 24, 2026
Santa Ynez River Valley Groundwater Basin Well Point Installation Project – Drilling Subcontractor Invitation to Bid under California Public Contract Code § 22000
Deadline for submission of proposals: 5pm Pacific Time on August 14, 2026
INTRODUCTION AND BACKGROUND
The Santa Ynez River Valley Groundwater Basin (SYRVGB) Eastern Management Area Groundwater Sustainability Agency (EMA GSA) was awarded grant funding through a Sustainable Groundwater Management Act Implementation Grant (Prop 68 Grant) to address data gaps identified in the Groundwater Sustainability Plan prepared for the SYRVGB. The Santa Ynez River Water Conservation District (SYRWCD) serves as the grantee on behalf of the EMA GSA to administer the Prop 68 Grant.
The EMA GSA is seeking proposals from a qualified C-57 licensed drilling contractor for the installation of one monitoring well and two piezometers. The scope of work for the project, general information, and requirements for submittal of a bid are described in detail in the bid package linked below and posted in the CSDA RFP Clearinghouse portal.
2026-Well Drill-EMA Bid Package compiled.pdf2026-SYRVGB_EMA_Drilling_Bid Schedule.xlsx